Tuesday, April 12, 2011

Preparing for concrete floors... no more dirt piles!

The garage 'hole' is filled in with sand to prepare for the garage floor to be poured (hopefully tomorrow), and the ground surrounding the house has been filled in and levelled.  Along with the garage floors, the basement floors should also be poured tomorrow.











Steve standing at the front door.  :-)

1 comment:

  1. Things are really moving along quickly! That 5th pic from the top really shows off the grade on your sledding hill. I've got a huge tractor inner tube to try out on it next winter when you have us over (hint hint)! :)

    ReplyDelete