Thursday, June 30, 2011

Front door!

Lots of activity today.  All the interior doors were inside waiting to get installed.  The kitchen cabinets are in the garage still their boxes.  Tomorrow will be a big day.  Today, though, was a day we've been waiting for - the front door was installed.

Wednesday, June 29, 2011

Tile, Hardwood, Engineered Wood, and Septic

I had my camera with us today when we went to see the house.  My oh my.  There's a big mess in the back yard from the septic system going in.



The tiling is done in the 2 full baths and the laundry/mud room:


Engineered wood in the basement:


Hardwood upstairs:
And the tile in the master bath:


Sunday, June 26, 2011

painting, deck floor, and fireplaces

My computer has been on life support the past week, so I've been unable to post pictures.  Steve pulled it back from the brink this morning.

In the past week, they've primed the walls, worked on the deck flooring, finished siding, installed septic, put in one of the garage doors, and completed most of the masonry for the fireplaces.  This week, flooring goes in and then kitchen cabinets - and hopefully the weather will cooperate for them to put the masonry on the front of the house.














Friday, June 17, 2011

It's looking like a house

I haven't been out to the house since Monday - and saw major progress today.  Siding is complete on the back of the house and west side.  The walls and ceilings are almost ready for primer.  Painting and flooring next week!  Only 10 weeks left...












Monday, June 13, 2011

Drywall and siding!

They finished putting up the drywall on Friday:












Today, we stopped by and mudding/taping was well underway - and the siding had been started!